The Generate drill-down option takes the raw Management Accounts data files and builds the 3 dimensional drill down display model. The model is constructed using the analysis codes that exist on the MA expense code and cost centre records.
Note: If any changes are made to the analysis code structures it is necessary to run this option to reflect those changes.
This option should be run in conjunction with Copy NL Actuals to MA as it is this program that imports the latest actual values into the MA data files.
To generate a drill down
Note: This option is usually run as part of the end-of-day chain within Timed Operations, however, the MA database can be updated at any time from this menu option. No separate end-of-year process needs to be run.
The MANAGEMENT ACCOUNTS menu is displayed.
Select the Generate drill-down option.
The various data sets are displayed.
Select the dataset that you want to re-create drill files for (i.e. CA = Current actuals) and click OK
A Generate Drill-Down form is displayed.
Click OK
Autoline extracts the values from the XX.MA.accts file and creates a drill file for the selected dataset.
For example: